Sunday, January 9, 2011

Allgeric Reaction To Feminine Pads

Golden Gate Bridge in New York Metro Central Station

The New York Metro (in English, New York City Subway) is the system the largest urban public transportation in the United States and one of the largest in the world, with between 416 and 475 stations (depending on how to account transfer points: MTA uses 468 as the official number of stations) and 656 miles ( 1,056 km) of primary roads in service. If you have tracks in workshops and garages the total to 842 miles (1,355 km). This meter is operated by the Transit Authority of New York City (New York City Transit Authority in the original English), colloquially known MTA New York City Transit by the Metropolitan Transportation Authority (Metropolitan Transportation Authority in English, hereinafter MTA) who is a member agency. Both are agencies created by the legislature of the State of New York in 1953 and 1968, respectively, to operate the publicly owned transport in the city of New York in the case of MTA New York City Transit on one side and to monitor the transport mass audience in the region of the City of New York in the case of MTA.
is
pending a law that will unite the operations of Metro New York City Transit MTA to MTA Staten Island Railway to form the new agency MTA Subways. In turn, the bus operations of MTA New York City Transit will go to another agency called MTA Bus (already created and currently hosts the oldest private bus operators in the city, acquired between January 3, 2005 and 20 February 2006).
Although known as "the subway", implying underground operations, about forty percent of the circulatory system on the ground, steel elevated structures or, more rarely, wrought iron, concrete viaducts, in trenches covered or open and-occasionally-on surface routes. All these modes of transit are completely separated from roads and walkways.


History
While the first subway line opened in 1904, the first elevated line (the line of the Ninth Avenue IRT) opened about 35 years earlier. The oldest structure still used (though enhanced) opened in 1885 as part of the Lexington Avenue line and is now part of the BMT Jamaica Line in Brooklyn. The oldest line of traffic completely separate open is the West End of BMT, in use since 1863. Metro Cars (model R44) operate on the railway from Staten Island (Staten Island Railway), but is not considered part of metro.
At the time the first subway opened, the lines were grouped into two separate systems of private property, Brooklyn Rapid Transit Company (BRT, later Brooklyn-Manhattan Transit Corporation, BMT) and Interborough Rapid Transit Company (IRT). The City Council was closely involved, each line built for the IRT and most of the lines built or improved for the BRT after 1913 were built by the City and leased to the companies (using the original 1 and Contracts 2 for the IRT subway and Dual Contracts for expansion later.) The first line operated by the Independent Subway System (Independent Subway System, IND) municipal property, opened in 1932, the system was designed to compete directly with private systems and allow it to dismantle some of the elevated railways and this is visible and enter nearby lines of the Seventh and Eighth Avenues (IRT and IND, respectively) and Jerome Avenue lines (IRT) and Grand Concourse (IND) in the Bronx, to cite two examples.
In 1940 the two private systems were bought by the city, some elevated lines were soon closed. Integration was slow, but they were built many connections between the IND and BMT and now operate as one division, the Division B. Because IRT is narrower, has maintained itself as a division, the Division A.


IRT map, 1906.

Metro system today
The New York Metro is designed to carry large numbers of people every weekday. Operates 24 hours, every day of the year, just three meters in the world do. In 2009 rode the Metro 1,579,866,600 passengers, with an average working day of 5,086,833 of usuarios.4 A typical subway station platforms is expected to measure between 400 and 700 feet (122 to 213 m), enough to accommodate a large number of people. Users enter a station by stairs towards the ticket windows and vending machines to buy the ticket, now with a MetroCard. After passing it on the wheel, users down to the platforms waiting. Some lines in the outer boroughs and Upper Manhattan have elevated railway with stations that passengers have to climb. With some exceptions, the subway tunnels between stations have a rectangular shape.
Most lines and stations have local service and espressos. The latter have three or four lanes, the outer two are for local trains and / plants / is for express trains. The stations where express trains stop are usually points of destination or transit important. One line (that of Jamaica, J and Z routes) use service "skip-stop" (alternate stops) in some sections, in which two services operate on the line at peak hours and less important stations are served by one of two line routes. From 1989 until May 31, 2005, Routes 1 and 9 stop service offered in alternate sections between 238 and 145 streets, being eliminated this service for MTA New York City Transit and replaced by route 1 now makes every stop along the line of Broadway and Seventh Avenue.
A subway train typically consists of 8 to 11 cars (the ferries or "shuttles" are little 2 cars), when compounds can be from 150 to 600 feet (46 to 183 meters) long. As a rule trains the heirs of the IRT lines are shorter and narrower than the trains that operate in other lines (IND and BMT), the result is that there are two different divisions can not share train (Division "A" trains on the old IRT and division "B" for the BMT and IND).
Underground stations are located throughout Manhattan, Brooklyn, Queens and The Bronx. All services pass through Manhattan, but one route, the local line "G" Brooklyn-Queens Crosstown, which directly links the two counties and the Rockaway Park shuttle and Franklin Avenue, which operate in Queens and Brooklyn respectively.
Staten Island is served by the railroad operated by MTA Staten Island Railway, which connects north and south ends of this island which is actually an operating division of the Metro section MTA New York City Transit, but is not considered as a meter, it is attached to the central system of American railroads.
On the other hand, there is a small subway linking the two banks of the Hudson River between New York (Manhattan, Street terminal 33/Herald Square and World Trade Center) and New Jersey (terminals in Newark, Hoboken, Journal Square and Exchange Place), but is not operated by MTA, but by the Port Authority of New York and New Jersey, called PATH (Port Authority stands for Trans-Hudson) and his older brother, has the characteristics of a metro (complete separation from other traffic and subway system in most of the route) and runs 24 hours a day, all year.
In 1994 the metro system introduced a special payment system called MetroCard fare allows travelers to use cards that hold money paid to the box office or at a vending machine. MetroCard was upgraded in 1997 to allow users to transfer between subways and buses within two hours. Other MetroCard with transfers only between meters were also put into circulation. The world famous token was removed in 2003, the same year that MTA raised the base fare to $ 2 despite protests from users and pressure groups and Straphangers Campaign. In 2005, the MTA increased prices for unlimited MetroCard, but left the base rate at $ 2.
Being an old system, most stations are not accessible to people with disabilities. The exceptions are new construction (or renovation, if Coney Island-Stillwell Avenue which was completely rebuilt) and major stations, as stipulated by the Americans with Disabilities Act (Americans with Disabilities Act, ADA ", in English).
The MTA began in the summer of 2005 the evidence for progressive automation of meter, including automated driving. It began with the BMT Canarsie line (route L). This route was chosen because it has no branches and practically does not cross any other line. The next line is planned to be automated of Flushing (Route 7) of the IRT for the decade of 2010.
Automation will use the "Operation of Trains A Person "(" One Person Train Operation, OPTO ", in the terminology used by transit employees). The benefits include automated meter cost reduction, security and reliability. Automated systems can be safer, because all the trains are in radio communication with every other (called "Communications-Based Train Control, CBTC, based train control communications) and its position and velocity are controlled carefully. That would lead to fewer delays and better service. The new system will replace the old mail in service for decades and often fails due to flooding (Also due to fire, the January 25, 2005, a fire at a quarter of signals at the Chambers Street station knocked out signals to the train lines A and C (Eighth Avenue BMT) and reductions This online service lasted about two weeks).
automatic trains are not entirely new, there are currently in Los Angeles and Paris. An experiment to automate the 42nd Street ferry in New York, begun in 1959, ended with a fire in Grand Central-42nd Street on April 24, 1964.
Critics argue that this automation can run trains with one person, threatens the personal safety of travelers, because normally the driver (the employee who opens and closes the doors of trains and stations makes the ads where they are not automated) is responsible to notify emergency services if necessary. This position would be eliminated and their tasks would the driver.

R142A model car of the Metro New York.

Lines and Routes
Many meters operate more or less static routes, so that a train line is almost synonymous with the railway route. In New York, the routes change frequently due to new connections or changes in the pattern of services. The line describes the physical railroad line or series of lines that uses a train route on its way from one terminal to another. Roads (also called services) are distinguished by a letter or number. The lines have names.
For example, the D train, Route Service D or D, although colloquially called the D line, runs along the following lines in its path:
In the Bronx, Concourse line;
In Manhattan, the line Eighth Avenue, the line of Sixth Avenue and Chrystie Street Connection;
In Brooklyn, the Fourth Avenue line and the line of the West End.
There are 26 train services in the subway system, including three short shuttle (shuttles). Each route has a color, representing the line that runs from Manhattan to the route in question, a different color is assigned to the Brooklyn-Queens Crosstown route, since it operates in Manhattan and ferries all have the dark gray color. Each service is also named after its Manhattan branch (or "crosstown") and is marked as local or express.
Trains are marked by blank service tags or black (for appropriate contrast) on a field in the color of your main line. The field is enclosed in a circle for most services or a diamond for special services such as express trains during peak hours only circulate on a route that operates normally at home. The panels also typically include the name of the service and terminals.
A Division (IRT) is at 1 Broadway Local and Seventh Avenue, 2 Seventh Avenue Express, 3 Seventh Avenue Express, 4 Lexington Avenue Express, 5 Lexington Avenue Express, 6 Local Lexington Avenue, 7 Flushing Local and S 42nd Street Shuttle.
B Division (BMT / IND) is the A Eighth Avenue Express, B Sixth Avenue Express, C Eighth Avenue Local, D Sixth Avenue Express, Local E Eighth Avenue, F Sixth Avenue Local, Local G Brooklyn-Queens Crosstown, J Nassau Street Express, L Street Local 14 and Canarsie, M Nassau Street Local, Express N Broadway, Broadway Express Q, R Broadway Local, S Franklin Avenue Shuttle, the Rockaway Park Shuttle S, V Sixth Avenue Local, Broadway Local W and Z Nassau Street Express.
Division C consists of other non-operations passenger traffic, including road maintenance and operations in garages.

simplified map of New York Metro, showing only the most important stations (2004).



Data Operation
Opening: 1904
Operator: New York City Transit Authority (popularly, MTA New York City Transit)
Lines: 24
Number of stations in 2009 : 468
Travelers in 2009 (year): 1,579,866,600
Average daily passengers (in days) in 2009: 5,086,833
Average daily trips (in days) in 2009: 8,279 Number of
travel in 2006: 2,680,573
employees in 2006: 27,807 Mileage
network: 1062.6 km (660 Mi)
No. Car in 2009: 6,380
Mean distance between failures (2009): 246,553.11 km (153,201 Mi)

Antigua currency to enter the subway in New York.

Fleet
The New York subway cars has the largest fleet in the world. About some 6,300 cars in 2009, are listed in New York City Transit. Cars purchased by the City of New York since the inception of the IND and the other divisions since 1948 are identified by the letter "R" followed by a number (eg R32). This is the number of contract by which the cars were purchased. Cars come with numbers (eg R1 to R9) are often virtually identical, having been just purchased by different contracts. The cars were known as "Type-R" to distinguish the models constructed for private operators.
The system maintains two separate fleets of cars, one for the IRT lines and one for the BMT and IND lines. All equipment in IRT is about 8 feet 9 inches (about 2.67 meters) wide and 51 '(approx. 15.5 meters) long, while all the equipment BMT and IND is approximately 10' ( 3 meters) wide and either 60 '(about 18.3 meters) or 75 "(about 22.86 meters) long.
Although the equipment of the two fleets can operate in the same way, the key factor that prevents interoperability is the fact that the two original contracts built for the IRT were made for a smaller profile. This is because IRT equipment chosen to use the same size as the one in use in all existing elevated railway in the city. This profile was consistent with older lines in service in Philadelphia, Boston and Chicago.
When the Brooklyn Rapid Transit Company began discussions to operate the new subway lines, made the decision to design a new type of car, 10 feet wide 67 feet long, the subject of numerous patents, longer profile was similar to the steam railway cars, allowing for greater passenger capacity, more comfortable seats and other benefits. The BRT design unveiled to the public in 1913, receiving such acceptance that all future lines were built for the BRT, IRT or, eventually, IND, would be built to accommodate the wider cars.
As a result, most of the IRT lines could accommodate the equipment of the BMT and IND larger, changes in station platforms and equipment sides of the tracks. This did not seem feasible, however, because the original meter, narrower, includes portions of two primary lines of Manhattan, as well as critical parts of the Brooklyn lines. This could be solved, but at great cost. On the other hand, would be relatively easy to convert most of the lines in the Bronx for the BMT and IND operations, some of the plans for the Second Avenue line have included the conversion of the IRT Pelham Line.

line 1 train approaching 125th Street in Manhattan. The convoy cars of this type are R62.

expansion plans and major projects
The major expansion is the construction of the Second Avenue line, called line and whose Phase I (from 96 to 63 streets, where it will connect with the lines of Broadway and Queens Boulevard), beginning the work on 12 April 2007. Providing for the opening of this line as a branch of the current line in 2014.
This line is planned from the beginning of the metro, but the crisis of the 20 and 30 (Black Thursday New York Stock Exchange in 1929, produced the biggest recession the U.S. economy in the twentieth century) and prevented it successively the Second World War and the rise in building highways throughout the United States in the 50 and 60, did not contribute to it to start this project.
Finally, its construction began in the seventies, but then was shelved due to budgetary problems (the fiscal crisis of New York City in the years 70) and do not have sections that can be used.
This will be the largest expansion in the Metro New York, which remained virtually unchanged since 1940, when the three operators were merged into a single corporation (only the Chrystie Street Connection in lower Manhattan, subway extensions to Rockaway - Long Train gained Island and Archer / Parsons (in 1988), 63 Street tunnel under the East River (in 1989) and Street Connection 63 (between 63 Street Tunnel and the Queens Boulevard line, in 2001) have been the most significant works ever since).
Other significant projects include:
The extension of train No. 7 from its terminal in Times Square, to Eleventh Avenue and Calle 34 (near the Convention Center Jacob K. Javits, along the Hudson River). Work began on December 3, 2007 and opening is planned for 2013.
Reconstruction of the South Ferry station, terminal of line 1, for It can take trains (now is a circular shaped station dates from the early days of Metro and can accommodate only five trailers, causing huge delays in the trains running on Seventh Avenue) is underway, causing service outages on weekends. This new station will allow a direct transfer stations enter the South Ferry and Whitehall (R and W Broadway line) without having to come to the surface. The opening was scheduled for 2008.
The construction of a heat exchanger called the Fulton Street Transit Center (Fulton Street Transit) on Broadway, Lower Manhattan, where nine subway lines converge, consist of a new building to facilitate connections between Seventh Avenue lines (2 and 3), Lexington (4 and 5), Eighth Avenue (A and C) and Nassau Street (J, M and Z). Also planned to connect the interchange with the future World Trade Center station to be built by English architect Santiago Calatrava, which also houses the underground PATH, there are plans to build a direct train to the International Airport John F. Kennedy. This project is scheduled for completion in June 2009, is underway, and also caused outages on weekends in the affected lines.
Finally the construction of Dey Street connector, which will allow direct connection between the exchanger Fulton Street Transit and the new terminal of the World Trade Center, is in progress, which has led to the closure of the Cortlandt Street station on the Broadway line (route R and W). It is planned to reopen the station in mid-2007, with the runway nearing completion, although the work is not pending will top the new terminal is built at the World Trade Center.

subway map showing only the night service.

In popular culture
The subway is often seen as an integral part of the city. Many people who lived in the area along the eighties remembers him for his crime and graffiti, but this has since fallen.
New York's subway has figured in many films protagonist. Probably the most notable appearances are in the 1971 film The French Connection. The pursuit meter tow the car's character under the elevated line of BMT West End is often considered the best chase sequence in movie history. Later, the 1974 film Pelham, One, Two, Three (The Taking of Pelham One Two Three) focuses on the hijacking of a train number 6 in Manhattan. The cult movie The Warriors, The Warriors (The Warriors) bases his argument on a street gang taking the subway from the northern Bronx to Coney Island in southern Brooklyn. Trailers fully painted graffiti in sharp contrast to the relatively clean subway system today. In 2004, Spider-Man 2 had a sequence of control and crash of a runaway elevated train in Manhattan, although there are ways that appear not, was filmed in Chicago elevated subway. In music, Duke Ellington's band played the theme Take the A Train (Take the A train) inspired by the line A to Harlem.

CI Yoseph BUITRAGO 18257871 CRF

How Long It Takes A Stove To Heat Up



Berlin Central Station (Hauptbahnhof Berlin in German) is the largest railway station of the European Union step. As its name suggests, is located in the center of Berlin (Germany), near the Chancellery, the Reichstag (German Parliament Building) and the Brandenburg Gate.
The complex is designed by the German architect Meinhard von Gerkan. The initial project cost was 700 million euros, an amount that rose to 900 million.

station from the river Spree.

History The station was designed from 1992 and construction began in 1995.3 was inaugurated on May 26, 2006, just in time for the celebration of the World Cup 2006.
The station replaces the eight terminals were in Berlin at the end of the nineteenth century with a single trading station in the form of two-level crossing.
The old terminal stations were severely damaged in World War II, and subsequently separated from their surroundings by the terms of the division of Germany into two states and three western sectors of Berlin. All the railway network of Berlin, East and West, was managed and operated by the Reichsbahn in the GDR. The few trains that linked West Berlin with West Germany (West Germany) did not finish in the historic terminal stations for their destinations and origins, but spent all the Stadtbahn, the railway viaduct through the center of Berlin east-west and through the territory of the GDR in Friedrichstaße station. The fall of the Berlin Wall in 1989 and the unification and also the decision to deploy the capital to Berlin forced to make major changes to integrate the new situation. The Stadtbahn had insufficient capacity for all traffic that had been created.
The solution made in the context of the Remodeling in Berlin is a mushroom with the cap design layout by Stadtbahn and stem for the new north-south line in the north-south tunnel. The crossing station was built on the site of the old Lehrter Bahnhof (Station Lehrte) near the end of the trains arrived from Hannover, Cologne and the nearby Ruhr Hamburg Station. Northern Trains arrive in the northern arch of the Ringbahn, circular railway line and west by the Stadtbahn.
lines formerly served by the Anhalter Bahnhof are linked to the central station by the north-south tunnel Fernbahn (Fernbahn or long distance to distinguish the tunnel north-south S-Bahn Berlin that are not supported by their different electrifición and the height of the trains).

Antigua Lehrter Bahnhof (1879), most of the city was destroyed by the Allies during the Second World War.

Operation Daily circulation is approximately 240,000 people spread over some 500 trains in the north-south and about 250 in the east-west. This is compounded by the movement of 1,000 trains trams and metro.
has 6 tracks on three platforms at the East-West, ie the top level of the viaduct and 8-way Stadtbahn underground North-South axis. It also has more than 80 businesses.

The building
The total area is 70,000 m² spread over five floors with a total of 15,000 m² for restaurants and shops in the three central plants, while the upper and lower house the railway platforms. On both sides of the station stand two office blocks.
The station is a few hundred yards from the old station Berlin Hauptbahnhof, Lehrter Bahnhof S-Bahn (Stadtbahn) Berlín-Spandau/Berlín-Charlottenburgo connecting with Berlin-Friedrichstrasse, Berlin-Alexanderplatz, Berlin and Berlin Ostbahnhof -Lichtenberg. The old station was demolished in the early 2000s, when it was built the infrastructure of the current Central Station to avoid cutting the major rail traffic that supports the Stadtbahn (a train every 30 seconds).
The station is a key element in the development of this area, with a development plan that maintains a balance between offices, hotels, shops, houses and gardens.
This station is equidistant from the two stations that were an party central stations in the city was divided before the fall of the Berlin Wall, Alexanderplatz in East Berlin and West Berlin Zoologischer Garten. Across the Spree River is the Parliamentary complex and the chancellery.
The central part is a curved arch of 20,000 m², consisting of 8,500 glasses of different sizes together for more than 80,000 m of braces.


Vista the first level and part of the second from the third floor of the station.
The station meets the highest standards of green architecture can implement this kind of constructions. The skillful use of natural light and especially the installation of photovoltaic panels on the roof, which provide about 50% of energy consumption of the season, put this book as a reference on the subject.
The fourth part of the budget was assigned to the foundation, and that the plant is located on the banks of the Spree river, over a territory which is based about 100 m of sand. We used a technique that involves building concrete ponds of 25 m deep, filled with ground water that was pumped.
is a fact that Berlin has the most impressive season in the world.

Rolling Horse, Europaplatz sculpture erected in front of the station.

Vista the first level and part of the second from the third floor of the station.

BUITRAGO Yoseph C.I. 18257871 CRF

Wow Can I Hack To Get Into An Instance

Hong Kong International Airport

Hong Kong International Airport (IATA: HKG, ICAO: VHHH) is the main airport in Hong Kong. It is colloquially known as Chek Lap Kok Airport (赤鱲角機場), because it was built on the island of Chek Lap Kok by land reclamation, and also to distinguish it from its predecessor, the closed Kai Tak Airport.
The airport opened for commercial operations in 1998, replacing Kai Tak, and is an important regional trans-shipment centre, passenger hub and gateway for destinations in Mainland China (with over 40 destinations) and the rest of Asia. Despite a relatively short history, Hong Kong International Airport has won seven Skytrax World Airport Awards for customer satisfaction in just ten years. However, HKIA ranked second and third in 2009 and 2010 respectively for the Skytrax World Airport Awards, although it still remains as the best airport taking into account passenger numbers annually.
HKIA also operates one of the world's largest passenger terminal buildings (the world's largest when opened in 1998) and operates twenty-four hours a day. The airport is operated by the Airport Authority Hong Kong and is the primary hub for Cathay Pacific Airways, Dragonair, Hong Kong Express Airways, Hong Kong Airlines and Air Hong Kong (cargo). It is a focus city for Vietnam Airlines, Garuda Indonesia, China Airlines and Air New Zealand[4] to a lesser extent Qantas and Virgin Atlantic, both of which use Hong Kong as a stopover point for flights on the Kangaroo Route between Australasia and Europe. Both United Airlines and Air India use Hong Kong as a stopover point for flights respectively from the United States to Singapore and Ho Chi Minh City as well as from India to Osaka and Seoul. In the near future, Garuda Indonesia is considering making Hong Kong their transit hub for flights to Europe while Swiss International Air Lines considers Hong Kong to be a major transfer hub for its network. This shows that Hong Kong International Airport is a key Asian airport for global airline operations.
Flights are operated by roughly 90 airlines to over 150 cities across the globe, and in 2009 it was the 13th busiest airport worldwide in terms of passenger throughput, registering 45,560,888. HKIA is also an important contributor to the Hong Kong economy, with 60,000 people employed at the airport.
In 2009, it was the second busiest airport in the world in terms of cargo traffic, handling 3,384,765 tons of cargo. During the first 10 months of 2010, HKIA is the busiest airport by cargo traffic in the world, ahead of Memphis Airport in USA.





History
Chek Lap Kok Airport was designed as a replacement for the former Hong Kong International Airport (commonly known as Kai Tak Airport) originally built in 1925. Located in the densely built-up Kowloon City District with a single runway extending into Kowloon Bay, Kai Tak had only limited room for expansion to cope with steadily increasing air traffic. By the 1990s, Kai Tak had become one of the world's busiest airports – it far exceeded its annual passenger and cargo design capacities, and one out of every three flights met delays, largely due to lack of space for aircraft, gates, and a second runway. In addition, noise mitigation measures restricted nighttime flights, as severe noise pollution (exceeding 105 dB(A) in Kowloon City) was estimated to adversely affect at least 340,000 people.
A 1974 planning study by the Hong Kong Civil Aviation and Public Works department identified the small island of Chek Lap Kok, off Lantau Island, as a possible airport replacement site. Away from the congested city centre, flight paths would be routed over the South China Sea rather than populous urban areas, enabling efficient round-the-clock operation of multiple runways. Construction of the new airport, however, did not begin until 1991. The construction period was very rushed; specialists considered only a 10-20 year period was sufficient for this massive project. Another cause for this rush was due to the uncertain future of the airport construction after
the transfer of sovereignty of Hong Kong to the People's Republic of China. It was originally believed that Beijing preferred to keep everything basically intact and minimise financial commitments for big projects, therefore stopping all construction despite the need for the new airport. At last, the airport did not finish in time for the Handover. However, China gave an additional year's grace period to finish the project. It was finished just in time.
Hong Kong International Airport was built on a large artificial island, formed by levelling Chek Lap Kok and Lam Chau islands (3.02 km² and 0.08 km² respectively), and reclaiming 9.38 km² of the adjacent seabed. The 12.48 km² airport site added nearly 1% to Hong Kong's total surface area, connecting to the north side of Lantau Island near Tung Chung new town.
Construction of the new airport was only part of the Airport Core Programme, which also involved construction of new road and rail links to the airport, with associated bridges and tunnels, and major land reclamation projects on both Hong Kong Island and in Kowloon. The project is the most expensive airport project ever, according to Guinness World Records. Construction of the new airport was voted as one of the Top 10 Construction Achievements of the 20th Century at the ConExpo conference in 1999.
With one of the world's largest airport terminals, the ability to withstand an intense typhoon was a major concern. The sides of the terminals, predominantly glass, were designed to break during high speed winds, relieving pressure and allowing the terminal to remain standing.
Opened on 6 July 1998, a week later than the new Kuala Lumpur International Airport, it took six years and US$20 billion to build. On that day at 6:25 am, Cathay Pacific flight 889 was the first commercial flight to land at the airport, pipping the original CX292 from Rome which was the scheduled first arrival. The architects were Foster and Partners. However, on the first day of opening, the airport had already started to experience some technical difficulties. The flight information display system (FIDS) had suddenly shut down which caused long delays. Shortly afterwards, the cargo communication link with Kai Tak, where all the data was stored, went down. In the same period of time, someone had accidentally deleted a critical database for cargo services. This meant that cargo had to be manually stored. At one point, the airport had to turn away freight headed for and exported from Hong Kong (except food and medical supplies) while it sorted out the mess. HKIA simply could not keep up without an automated computer assisting. For three to five months after its opening, it suffered various severe organisational, mechanical and technical problems that almost crippled the airport. Computer glitches were to blame for the crisis. Lau Kang-way, a Hong Kong politician, was quoted saying "This was meant to be a first-class project, but it has turned into a ninth-class airport and a disgrace. Our airport has become the laughing stock of the world. At one time, the government reopened the cargo terminal at Kai Tak Airport to handle freight traffic because of a breakdown at the new cargo terminal, named Super Terminal One (ST1). However, after six months the airport started to operate normally.
Officially opened in June 2007, the second airport terminal, called T2, (check-in facility only) is linked with the MTR Airport Express on a new platform. The terminal also features a new shopping mall, SkyPlaza, providing a large variety of shops and restaurants, together with a few entertainment facilities. T2 also houses a 36-bay coach station for buses to and from mainland China and 56 airline check-in counters, as well as customs and immigration facilities.
Besides T2, the SkyCity Nine Eagles Golf Course has been opened in 2007 whereas the second airport hotel, the Hong Kong SkyCity Marriott Hotel; and a permanent cross-boundary ferry terminal, the SkyPier, began operations in 2008 and 2009 respectively. Development around T2 also includes the AsiaWorld-Expo which has started operation in late 2005. A second passenger concourse, the North Satellite Concourse (NSC), opened in 2010.
A study for the HKIA Master Plan 2030 is underway to examine whether and how infrastructures at HKIA - including airport access, terminal and apron facilities and a new runway - should be developed to support the economic growth of Hong Kong and the region.
In June 2010, the Airport Authority unveiled plans to develop in stages the vast midfield site of the airport island. Stage 1 will involve the construction of a new 20 gate passenger concourse to be built in 2 phases (completion 2015 and 2020) with 11 gates in phase 1 growing to 20 gates in phase 2. Configuration of the new concourse is similar to those at Hartsfield-Jackson Atlanta International Airport, London Heathrow Terminal 5 and Seoul Incheon airport. After stage 1 of midfield development is completed in 2020, there will be sufficient lands remaining for further new concourses to be built as and when demand for them materialises

Composition
The airport has a total of 70 boarding gates, with 63 jet bridge gates and seven virtual gates which are used as assembly points for passengers, who are then ferried to the aircraft by apron buses. Of the 63 jet bridges, five are capable of handling the Airbus A380. Singapore Airlines and Emirates currently deploy A380s to Hong Kong and use those gates.

Terminal 1
Terminal 1 of the HKIA is currently the third largest airport passenger terminal building in the world (570,000 m²), after Dubai International Airport's Terminal 3 (1,500,000 m²) and Beijing Capital International Airport's Terminal 3 (986,000 m²).
At its opening, Terminal 1 was the largest airport passenger terminal building, with a total gross floor area of 550,000 m². It briefly conceded the status to Bangkok's Suvarnabhumi Airport (563,000 m²) when the latter opened on 15 September 2006, but reclaimed the title when the East Hall was expanded, bringing the total area to its current size (the East Hall expansion included a 39,000 m² expansion to SkyMart, a shopping mall). Terminal 1's title as the world's largest was surrendered to Beijing's airport's Terminal 3 on 29 February 2008.

Terminal 2
Terminal 2 (140,000 m²), together with the Skyplaza, opened on 28 February 2007 along with the opening of the Airport Station's Platform 3. It is only a check-in and processing facility for departing passengers with no gates or arrival facilities (passengers are transported underground to gates at Terminal 1). So far a majority of low-cost carriers and some full-service carriers have relocated their check-in operations to T2. The SkyPlaza is situated within Terminal 2. Architecture firm Skidmore, Owings and Merrill designed Terminal 2 and the SkyPlaza

North Satellite Concourse
In 2007, HKIA began the construction of a two-storey North Satellite Concourse (NSC) which opened in December 2009. This concourse was designed for narrow-body aircraft and is equipped with 10 jet bridges. The concourse has a floor area of 200,000 m² and will be able to serve more than five million passengers annually. There is a shuttle bus service between the NSC and Terminal 1 every four minutes. The concourse was commissioned at the end of 2009





Operations
The airport is operated by the Airport Authority Hong Kong, a statutory body wholly owned by the Government of Hong Kong Special Administrative Region. The Civil Aviation Department (CAD) is responsible for the provision of air traffic control services, certification of Hong Kong registered aircraft, monitoring of airlines on their compliance with bilateral Air Services Agreements and the regulation of general civil aviation activities.
The airport has two parallel runways, both of which are 3800 metres in length and 60 metres wide, enabling them to cater to the next generation of aircraft. The south runway has been given a Category II Precision Approach, while the north runway has the higher Category IIIA rating, which allows pilots to land in only 200 metre visibility. The two runways have an ultimate capacity of over 60 aircraft movements an hour. Normally, the north runway (07L/25R) is for landing passenger planes. The south runway (07R/25L) is for passenger planes taking off and cargo planes taking off and landing.
There are 49 frontal stands at the main passenger concourse, 28 remote stands and 25 cargo stands. Five parking bays at the Northwest Concourse are already capable of accommodating the arrivals of the next generation of aircraft. A satellite concourse with 10 frontal stands for narrow body aircraft has been commissioned to the north of the main concourse at the end of 2009, bringing the total number of frontal stands at the airport to 59.
The airport was the third busiest for passenger traffic in Asia in 2008, and the world's second busiest airport for cargo traffic in 2008. In terms of international traffic, the airport is the third busiest for passenger traffic and the busiest for cargo since its operation in 1998. There are 85 international airlines providing about 800 scheduled passenger and all-cargo flights each day between Hong Kong and some 150 destinations worldwide. About 76 percent of these flights are operated with wide-bodied jets. There are also an average of approximately 31 non-scheduled passenger and cargo flights each week.
The operation of scheduled air services to and from Hong Kong is facilitated by air services agreements between Hong Kong and other countries. Since the opening of HKIA, the Hong Kong Special Administrative Region Government has implemented a policy of progressive liberalisation of air services with the intention of promoting consumer choice and competition. Many low-cost airlines have started various regional routes to compete head-on with full-service carriers on trunk routes.
The airport's long term expansion opportunities are subject to variables. A proposal to build a third runway has been under feasibility study and consultation but would be very expensive as it would involve additional reclamation from deep waters, and the building cost of the third runway may be as high as the building cost of the entire airport. On the other hand, there exists only one airway between Hong Kong and mainland China, and this single route is often and easily backed up causing delays on both sides. In addition, China requires that aircraft flying the single air route between Hong Kong and the mainland must be at an altitude of at least 15,000 feet. Talks are underway to persuade the Chinese military to relax its airspace restriction in view of worsening air traffic congestion at the airport. Other than that, Hong Kong Airport Authority is cooperating with other airports in the area to relieve air traffic and in the future, Shenzhen may act as a regional airport while Hong Kong receives all the international flights.




Air traffic
Recreational flying in Hong Kong is catered for by the Hong Kong Aviation Club, which undertakes flying training for private pilots and provides facilities for private owners.
The Government Flying Service provides short and long range search and rescue services, police support, medical evacuation and general purpose flights for the Government.

Passenger facilities
The airport is one of the most accessible in operation today. Despite its size, the passenger terminal is designed for maximum convenience. A simple layout and effective signage, moving walkways and the automated people mover allow quick and easy movement throughout the building. The airport also features the HKIA Automated People Mover, a driverless people mover system consisting of 3 stations to provide fast transportation between the check-in area and the gates. These trains travel at 62 km/h and there is no charge for their use.

Hong Kong Business Aviation Centre
The Hong Kong Business Aviation Centre (BAC) is located within the confines of the airport and has its own terminal and facilities separate from the public terminal. It provides a full range of services for executive aircraft and passengers, including passenger lounge, private rooms and showers, business centre facilities, ground handling, baggage handling, fuelling, security, customs and flight planning. Designated spaces and hangarage are also provided at the BAC for private aircraft.

Intermodal transportation hub
In order to sustain the growth of passengers, the Airport Authority formulated a “push and pull through” strategy to expand its connections to new sources of passengers and cargo. This means adapting the network to the rapidly growing markets in China and in particular to the Pearl River Delta region (PRD). In 2003, two major events improved connections to the PRD. One was the opening of a new Airport-Mainland Coach Station. The coach station features a 230 m² waiting lounge and sheltered bays for ten coaches. The dedicated coach terminal provides a comfortable environment for passengers travelling between HKIA and different cities in the PRD. A huge number of buses are operating per day to transport passengers between HKIA and major cities in the Mainland.
The Coach Station was relocated to Terminal 2 in 2007. The 36 bays at the new Coach Station allow cross-border coaches to make 320 trips a day carrying passengers between the airport and 90 cities and towns in the PRD. Local tour and hotel coaches also operate from T2.
HKIA’s network to China is also expanded by the opening of SkyPier in late September 2003, offering millions in the PRD direct access to the airport. Passengers coming to SkyPier by high-speed ferries can board buses for onward flights while arriving air passengers can board ferries at the pier for their journeys back to the PRD. Passengers travelling both directions can bypass custom and immigration formalities, which reduces transit time. Four ports – Shekou, Shenzhen, Macau and Humen (Dongguan) – were initially served. As of August 2007, SkyPier serves Shenzhen's Shekou and Fuyong, Dongguan's Humen, Macau, Zhongshan and Zhuhai. Moreover, passengers travelling from Shekou and Macau piers can even complete airline check-in procedures with participating airlines before boarding the ferries and go straight to the boarding gate for the connecting flight at HKIA. The provision of cross boundary coach and ferry services has transformed HKIA into an inter-modal transportation hub combining air, sea and land transport.




Baggage and cargo facilities
Ramp handling services are provided by Hong Kong Airport Services Limited (HAS), Jardine Air Terminal Services Limited and SATS HK Limited. Their services include the handling of mail and passenger baggage, transportation of cargo, aerobridge operations and the operation of passenger stairways. The airport has an advanced baggage handling system (BHS), the main section of which is located in the basement level of the passenger terminal, and a separate remote transfer facility at the western end of the main concourse for handling of tight connection transfer bags.
HKIA currently handles well over three million tonnes of cargo annually. Hong Kong Air Cargo Terminals Limited operates one of the two air cargo terminals at the airport. Its headquarters, the 328,000 m² SuperTerminal 1, is the world’s second largest stand-alone air cargo handling facility, after the opening of the West Cargo Handling Area of the Shanghai Pudong International Airport in 26 Mar 2008. The designed capacity is 2.6 million tonnes of freight a year. The second air cargo terminal is operated by Asia Airfreight Terminal Company Limited, and currently has a capacity of 1.5 million tonnes a year. It is envisaged that HKIA’s total air cargo capacity per annum will reach nine million tonnes ultimately.

Aircraft maintenance services
Both line and base maintenance services are undertaken by Hong Kong Aircraft Engineering Company (HAECO), while China Aircraft Services Limited (CASL) and Pan Asia Pacific Aviation Services Limited carry out line maintenance. Line maintenance services include routine servicing of aircraft performed during normal turnaround periods and regularly scheduled layover periods. Base maintenance covers all airframe maintenance services and, for this, HAECO has a three-bay hangar, which can accommodate up to three Boeing B747-400 aircraft and two Airbus A320 aircraft, and an adjoining support workshop. HAECO also has the world's largest mobile hangar, weighing over 400 tons. It can be used to enclose half of a wide-body airplane, so that the whole facility can fully enclose four 747s when the mobile hangar is used. A new two-bay hangar that locates next to the current one will be in operation by the end of 2006.
On 29 May 2009, CASL opened its first aircraft maintenance hangar in the maintenance area of the airport. The new hangar occupies an area of about 10,000 square metres to accommodate one wide-body and one narrow-body aircraft at the same time, the hangar also has about 10,000 square metre area in its annexe building.

Airport based ground services
The Air Traffic Control Complex (ATCX), located at the centre of the airfield, is the nerve centre of the entire air traffic control system. Some 370 air traffic controllers and supporting staff work around the clock to provide air traffic control services for the safe and efficient flow of aircraft movements within the Hong Kong Flight Information Region (FIR). At the Air Traffic Control Tower, controllers provide 24-hour aerodrome control services to aircraft operating at the airport. A Backup Air Traffic Control Centre/Tower constructed to the north of the ATCX is available for operational use in the event normal services provided in the ATCX are disrupted by unforeseen circumstances. Apart from serving as an operational backup, the facilities are also used for air traffic control training.
The Airport Meteorological Office (AMO) of the Hong Kong Observatory (HKO) provides weather services for the aviation community The AMO makes routine and special weather observations and provides fixed-time aerodrome forecasts and landing forecasts for the HKIA. It issues aerodrome warnings on adverse weather for protection of aerodrome facilities and aircraft on the ground. It also issues significant weather information on thunderstorms, tropical cyclones, turbulence, icing and other hazardous weather which may affect aviation safety in the area within which Hong Kong is responsible for the provision of air traffic services. To enhance the safety of aircraft landing and taking off from HKIA, the AMO issues alerts of low-level windshear and turbulence.
Rescue and fire fighting services within the airport are covered by the Airport Fire Contingent of the Hong Kong Fire Services Department. The contingent has a strength of 282 uniformed members, operating two fire stations and two rescue berths for 24-hour emergency calls. It is equipped with 14 fire appliances which can respond to incidents within two minutes in optimum conditions of visibility and surface conditions, satisfying the relevant recommendation of the International Civil Aviation Organisation. Two high capacity rescue boats, supported by eight speed boats, form the core of sea rescue operations.

Ground transport
The Airport was built with ground-transportation considerations in mind connected by the North Lantau Highway on Lantau Island, providing a fast and scenic link to inner Hong Kong. Getting to and from Hong Kong International Airport is therefore easy, convenient and relatively inexpensive.
Terminal-to-terminal travel is also quick and simple. Operated by the Airport Authority and maintained by MTR Corporation, there is an automated people mover connecting the East Hall to the West Hall and Terminal 2. Extension to SkyPier was also completed and opened to public in late 2009.


Airport Express - Airport Station

Bus
Main article: Buses in Hong Kong
Citybus, New Lantao Bus, Long Win Bus and Discovery Bay Bus all together operate 25 bus routes to the airport from various parts of Hong Kong, available at the Airport Ground Transportation Centre and Cheong Tat Road. The bus companies also offer 10 overnight "N" services since the airport is open 24-hours a day.
Passengers can also take the S1 Citybus to the Tung Chung MTR Station. From there they can board the MTR Tung Chung line which follows the same route as the MTR Airport Express to Central.
Coach services are available to major cities and towns in Guangdong Province, such as Dongguan, Guangzhou and Shenzhen.

Ferry
Direct ferry services are available from the airport to various destinations throughout the Pearl River Delta. Passengers using these services are treated as transit passengers and are not considered to have entered Hong Kong for immigration purposes. For this reason, access to the ferry terminal is before immigration in the airport for arriving passengers. Check-in services are available at these piers. Four ports – Shekou, Shenzhen, Macau and Humen (Dongguan) – were initially served, extending to Guangzhou and Zhongshan at the end of 2003. The Zhuhai service began on 10 July 2007 while a Nansha service started on 14 July 2009.

Rail
Main article: Rail transport in Hong Kong
The airport can be reached by the Airport Express, a dedicated rail link provided by the Mass Transit Railway. It takes 24 minutes to reach the airport from Hong Kong station, thus awarding it the fastest mode of transport to get to the airport. It offers local MTR line connections along the line. In addition, both Hong Kong and Kowloon stations provide complimentary and exclusive in-town check-in services for major airlines.
Passengers may also consider take the one-minute journey to AsiaWorld-Expo, which is also located in Chek Lap Kok. This segment of the Airport Express started operations on 20 December 2005 to facilitate the opening of the expo.
In the latest policy address by Donald Tsang Yam-kuen, the chief executive of the Special Administrative Region, the government is also studying the feasibility of building a railway connecting between Hong Kong International Airport and Shenzhen Bao'an International Airport to provide further convenience to business and leisure travellers

Taxi
Main article: Taxicabs of Hong Kong
The airport is served by all three different types of taxi, distinguished by their colour:
Urban taxis connect the Airport with Hong Kong Island, Kowloon and parts of the new towns of Tsuen Wan, Sha Tin and Tseung Kwan O (urban taxis can go anywhere in Hong Kong except southern Lantau Island).
New Territories taxis connect the airport with the New Territories, except those parts of the Tsuen Wan, Sha Tin and Tseung Kwan O served by urban taxis.
Lantau taxis connect the airport with the rest of Lantau Island.

Airport hotels
There are 3 hotels located in the nearby area, which are: Hong Kong Skycity Marriott Hotel (connect to AsiaWorld Expo), Novotel Hong Kong Citygate (Tung Chung) and Regal Airport Hotel.

Accidents and incidents
On 22 August 1999, China Airlines Flight 642 (an MD-11 operated by subsidiary Mandarin Airlines), which was landing in Typhoon Sam at Hong Kong International Airport en route from Bangkok International Airport (now Bangkok Don Mueang International Airport) to Hong Kong, rolled over and caught fire, coming to rest upside down beside the runway. Three people onboard were killed.
On 31 July 2000 a man, armed with a pistol, forced his way through a security checkpoint and held a woman hostage on a Cathay Pacific aircraft. The man surrendered after two and a half hours

In media
Hong Kong International Airport was featured in the episode "Hong Kong Airport" from Richard Hammond's Engineering Connections. In the episode, Hammond mostly talks about how the airport is able to withstand typhoons, and how it was built.
The airport was also featured in Discovery Channel's Extreme Engineering. It shows how the airport, along with other links, were built, and some brief history of the airport.
Hong Kong International Airport also featured in a documentary broadcasted on TVB in Hong Kong called City of the Sky which focused on the operations of the airport itself.
The airport was also featured in the 2001 Brett Ratner film Rush Hour 2, where Chief Inspector Lee Jackie Chan and Detective James Carter Chris Tucker fly from Hong Kong to Los Angeles.

Awards
AETRA Best Airport Worldwide (2005)
Air Cargo News Cargo Airport of the Year (2002–2003)
Air Cargo World Air Cargo Excellence (2007)
Air Transport Research Society Asia Pacific Airport Efficiency Excellence Award (2007)
Airports Council International World's Best Airport (2007–2008)
Asiaweek Asia's Best Airport (2000)
British Constructional Steelwork Association, the Steel Construction Institute and British Steel Structural Steel Design Award (1999)
Business Traveller Best Airport in China (2006–2007)
Centre for Asia Pacific Aviation CAPA International Airport of the Year (2007)
Conde Nast Traveller World's Best Airport (2007)
Construction Industry Manufacturers Association CONEXPO-CON/AGG '99 Top 10 Construction Achievements of the 20th Century - Airport Core Programme (1999)
Federation of Asia Pacific Aircargo Associations Most Friendly Airport for Cargo (2005)
Hong Kong Institute of Architects Silver Medal for Architecture (1999)
Hong Kong Institute of Certified Public Accountants Diamond - Best Corporate Governance Disclosure Awards (2004)
International Air Transport Association (IATA) Eagle Award (2002)
Raven Fox Award for Travel-Retail Excellence in Asia / Pacific (1999–2000)
Skytrax World's Best Airport (2001–2005, 2007–2008)
SmartTravelAsia.com Best Airport Worldwide (2006–2007)
TravelWeekly Best International Airport (2007)
TravelWeeklyChina Best Airport Facilities (2006)
TTG Best Airport (2002, 2004–2008; Survey was not held in 2003 owing to SARS)
WTA World Travel Awards Asia/ Pacific's Leading Airport (2000)

YOSEPH BUITRAGO C.I. 18257871 CRF